Tasting Room Construction
Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9
Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9
![]() Installing the maple ceiling boards. |
![]() Applying the first coat of exterior lime plaster. |
![]() Covering the last of the bales with lime plaster. |
![]() First coat of lime plaster. |
![]() Black Ankle rocks awaiting installation on the face of the building. |
![]() First blades of grass peeking through on the hill behind the building. |







