Tasting Room Construction
Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9
Installing the maple ceiling boards.
Installing the maple ceiling boards.
Applying the first coat of exterior lime plaster.
Applying the first coat of exterior lime plaster.
Covering the last of the bales with lime plaster.
Covering the last of the bales with lime plaster.
First coat of lime plaster.
First coat of lime plaster.
Black Ankle rocks awaiting installation on the face of the building.
Black Ankle rocks awaiting installation on the face of the building.
First blades of grass peeking through on the hill behind the building.
First blades of grass peeking through on the hill behind the building.